Burlington Office

905 Century Drive
Burlington, ON, L7L 5J8
T: 905.634.3324

Atlantic Office

373 Urquhart Avenue

Moncton, NB, E1H 2R4

T: 506.345.0667
 

Edmonton Office

2181 Premier Way, Unit 292
Sherwood Park, AB, T8H 2V1
T: 780.410.0542

Burnaby Office

#104 - 3999 Henning Drive

Burnaby, BC, V5C 6P9

T: 236.317.2866
 

Calgary Office 

Calgary Place One
Suite 750, 330 5th Ave SW
Calgary, AB, T2P 0H9
T: 403.262.3083

Pittsburgh Office

965 Greentree Road

Pittsburgh, PA, 15220
 

Toll-free number: 888.624.5142

Sarnia Office

201 Front Street North

Suite 210

Sarnia, ON, N7T 7T9
T: 519.464.7390

© 2016 TWD

CHEMICAL PROCESSING

TWD specializes in the development, implementation, optimization and upgrading of chemical and biochemical plants for the production of a full range of industrial and household uses.

 

Our project capabilities range from small plant upgrades to large grass roots facilities. TWD also provides optimization services to assist our clients with optimization of current operating assets.

 

Our clients include organic and inorganic chemical producers and distributors and our experience includes the following:

Process Development and Optimization

  • Batch processes

  • Continuous processes

  • Catalytic processes

  • Exothermic / endothermic

Blending, Terminalling & Transfer

  • Blending systems (inline, batch, automated batch, tank)

  • Bulk loading and offloading facilities (truck, rail, marine)

  • Control and card lock systems

  • Dispensing systems

  • Material handling systems

  • Pigging systems

  • Piping systems

  • Tank gauging and inventory

  • Management systems

  • Tanks and silos

Process Safety Management (PSM) and Responsible Care

  • Compliance audits

  • Pre-start health and safety reviews (PSRs)

  • Process hazards analysis (PHAs, HAZOPs, FMEAs)

Environmental Units

  • Flue gas desulphurization (FGD)

  • Selective catalyst reduction (SCR)

  • Carbon dioxide removal (CO2)

  • NOx reduction

 

AGRICULTURAL NITROGEN PLANT

SUSTAINING CAPITAL PROJECTS

Client:

Location:     Courtright, ON

Project Highlights:
  • TWD provided Project Management and Engineering Services on a variety of projects at the facility. 
     

  • Projects included upgrades to various process systems including:

    • Anhydrous Ammonia

    • Aqua Ammonia

    • Granular Urea

    • Nitric Acid

    • Urea Ammonium Nitrate (UAN) Solution

    • Urea Liquor

    • Diesel Exhaust Fluid (DEF)

Lets connect to discuss upcoming opportunities